This support article will show how to export data from Power BI.
A new option is available that will enable data from Power BI to be exported. This is visible in the top left of the screen when 'Power BI Reports' has been selected on the lefthand panel.
There are two file formats available for the export.
Once the format has been selected, the reports will be submitted and run in the background.
There is a register of exports, which will show the current status.
This register can also be accessed via the left hand panel
The downloaded files will contain a snapshot of all reports
Comments
0 comments
Please sign in to leave a comment.