In this article we explain under which Workflows you should raise a notice for the following contract types, so you have a quick reference guide:-
- NEC3 ECC - Quick Reference Clause Guide
- NEC3 ECS - Quick Reference Clause Guide
- NEC3 PSC - Quick Reference Clause Guide
- NEC3 TSC - Quick Reference Clause Guide
- NEC3 ECSS - Quick Reference Clause Guide
- NEC3 ECSC - Quick Reference Clause Guide
- NEC3 SSC - Quick Reference Clause Guide
- NEC3 SC - Quick Reference Clause Guide
- NEC3 FC - Quick Reference Clause Guide
- NEC3 TSSC - Quick Reference Clause Guide
You can also get a copy of the file as a spreadsheet if you need to set up a custom contract, although this article will be periodically updated with improvements, so the best thing to do is click the follow button.
NEC3 ECC - Quick Reference Clause Guide
NEC3 ECC |
|
| Early Warning | |
| Project Manager Early Warning | |
| Increase the total of the Prices | |
| Delay Completion | |
| Delay meeting a Key Date | |
| Impair the performance of the works in use | |
| Affect the achievement of another Partner's objectives | |
| Contractor Early Warning | |
| Increase the total of the Prices | |
| Delay Completion | |
| Delay meeting a Key Date | |
| Impair the performance of the works in use | |
| Affect the achievement of another Partner's objectives | |
| Increase the Contractor's total cost | |
| Instructions | |
| Project Manager Instructions | |
| 14.3 | to change the Works Information or a Key Date |
| 17.1 | to resolve an ambiguity or inconsistency |
| 18.1 | to change the Works Information to remove something which is illegal or impossible |
| 19.1 | on how to deal with a prevention event |
| 23.1 | to submit particulars of design of an item of Equipment |
| 24.2 | to remove an employee |
| 26.4 | to submit proposed contract data for a subcontract (main Options C, D, E and F) |
| 32.2 | to submit a revised programme |
| 34.1 | to stop or not start work |
| 34.1 | to start or restart work |
| 36.1 | to submit a quotation for acceleration |
| 44.2 | to change the Works Information after accepting a proposal not to correct a Defect |
| 62.1 | to submit alternative quotations for a compensation event |
| 73.1 | on how to deal with an object of value of historical interest |
| 82.1 | to not replace or repair the works, Plant and Material following loss or damage |
| 92.2 | to leave Site, remove Equipment, Plant and Materials and assign the benefit of the subcontract to the Employer |
| X12.1(4) | providing Partnering Information |
| Other Instruction | |
| Programme | |
| Project Manager Reply - Not Accepted | |
| The Contractor's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Contractor's plans realistically | |
| It does not comply with the Works Information | |
| Notifications | |
| Project Manager Notifications | |
| 13.2 | of a change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation events periods) |
| 14.2 | of the cancellation of a delegation |
| 17.1 | of an ambiguity or inconsistency |
| 27.2 | to provide access to the work being done and Plant and Materials being stored |
| 44.1 | of a proposal to accept a Defect |
| 45.1 | of the amount to be paid for uncorrected Defects |
| 45.2 | of the cost the Contractor would incur in correcting a Defect |
| 61.5 | that the Project Manager has decided the Contractor did not give early warning of a compensation event |
| 61.6 | that an assumption on which a compensation event quotation is based was wrong |
| 90.1 | of a wish to terminate |
| 91.2 | of a default/of the Contractor having not put right a default |
| 91.3 | of a default/of the Contractor having not put right a default |
| 92.2 | that Equipment is no longer required |
| X7.3 | of the amount of reduction in delay damages following take over of part of the works |
| X18.5 | of a matter for which the Contractor is liable |
| Y2.3 | of an intention to pay less than the notified sum |
| Other notification | |
| Contractor Notifications | |
| 13.2 | of a change of address for communications |
| 17.1 | of an ambiguity or inconsistency |
| 18.1 | of an illegal or impossible requirement |
| 20.3 | of advice on the practical implications of the design and subsubcontracting arrangements (main Options C, D, E and F) |
| 61.4 | of a failure by the Project Manager to respond to a compensation event notification |
| 62.6 | of a failure by the Project Manager to respond to a quotation |
| 64.4 | of a failure by the Project Manager to make an assessment of a compensation event |
| 73.1 | that an object of value of of historical or other interest has been found |
| 90.1 | of a wish to terminate |
| Y2.3 | of an intention to pay less than the notified sum |
| Other notification | |
| Supervisor Notifications | |
| 13.2 | of change of address for communications |
| 14.2 | of the cancellation of a delegation |
| 40.3 | of a test or inspection or the result of a test or inspection |
| 41.1 | that Plant and Materials have passed a test or inspection |
| Other notification | |
| Submissions | |
| Project Manager Submissions | |
| 87.1 | of certificates of insurance provided by the Client |
| Contractor Submissions | |
| 15.1 | a proposal to add an area to the Working Area |
| 20.4 | forecasts of the total Defined Cost for the whole of the works (main Options C, D, E and F) |
| 21.2 | particulars of design |
| 23.1 | particulars of design for an item of Equipment |
| 24.1 | details of a replacement person |
| 26.2 | the name of a proposed Subcontractor |
| 26.3 | proposed subcontract documents |
| 26.4 | proposed contract data for each subcontract (main Options C, D E and F) |
| 44.1 | a proposal to accept a Defect |
| 54.2 | a revised activity schedule (main Option A and C) |
| 85.1 | certificates of insurance |
| X4.1 | a parent company guarantee |
| X13.1 | a performance bond |
| X14.2 | an advance payment bond |
| X20.2 | a report of performance |
| X20.3 | proposals for improving performance |
| Y1.4 | details of the banking arrangement for the Project Bank Account |
| Y1.6 | a proposal to add a Supplier to the Named Suppliers |
| Y1.9 | the Authorisation setting out sums due to the Named Suppliers |
| Other submission | |
| Submission with quote | |
| 36.1 | a quotation for acceleration |
| 44.2 | a quotation to accept a Defect |
| Forecasts | |
| Cost Forecasts | |
| NEC3 ECC Option C - as per Clause 20.4 | |
| NEC3 ECC Option E - as per Clause 20.4 | |
| Other Assessments | |
| PM Assessments | |
| 25.2 | of the amount to be paid as the Contractor failed to provide services |
| 25.3 | of the amount assessed for a failure to meet a Key Date |
| 40.6 | of an assessment of the amount to be paid for repeating a test or inspection |
| 45.1 | of the cost to the Employer of having a Defect corrected |
| 45.2 | of the cost the Contractor would incur in correcting a Defect |
| 51.3 | of interest on a corrected payment certificate |
| 53.3 | of the preliminary assessment of the Contractor's share (main Option C and D) |
| 53.4 | of the final assessment of the Contractor's share (main Option C and D) |
| 85.1 | of the cost of insurance provided by the Employer |
| 93.6 | of the Contractor's share on termination (Option C and D) |
| X1.3 | of the price adjustment added to the amount due (Options A and B) |
| X1.4 | of the price adjustment added to the Prices (Option C and D) |
| X6.1 | of the amount of bonus |
| X7.1 | of the amount of delay damages |
| X14.1 | of the amount of advanced payment |
| X14.3 | of the amount of repayment of advanced payment |
| X16 | of the amount to withhold as retention |
| X17 | of the amount of low performance damages |
| X20.4 | of the amount payable for meeting a target on the incentive schedule |
| Certificates | |
| Project Manager Certificates | |
| 30.2 | Completion Certificate |
| 35.3 | Taking Over Certificate |
| 90.1 | Termination Certificate |
| Supervisor Certificates | |
| 44.3 | Defects Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Works Information |
| 60.1(2) | Employer does not provide access to the Site |
| 60.1(3) | Employer does not provide something that he is to provide |
| 60.1(4) | An instruction to stop or not start work or to change a Key Date |
| 60.1(5) | Employer or Others do not work within the stated constraints |
| 60.1(6) | Project Manager or Supervisor does not reply to a communication |
| 60.1(7) | An instruction dealing with an object of interest or value |
| 60.1(8) | Change of a decision |
| 60.1(9) | Withholds an acceptance |
| 60.1(10) | An instruction to search for a Defect and no Defect is found |
| 60.1(11) | A test or inspection causes unnecessary delay |
| 60.1(12) | Contractor encounters physical conditions |
| 60.1(13) | A weather measurement is recorded |
| 60.1(14) | An event which is the Employer's risk |
| 60.1(15) | Project Manager certifies Take Over before Completion |
| 60.1(16) | Employer does not provide material for testing |
| 60.1(17) | Notification of a correction |
| 60.1(18) | A breach by the Employer |
| 60.1(19) | A prevention event |
| 60.4 | A difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D) |
| 60.5 | A difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D) |
| 60.6 | Correction of a mistake in the Bill of Quantities caused by a departure in the method of measurement |
| X2.1 | A change in the law |
| X12.3(7) | A change in the Partnering Information |
| X14.2 | Delay in making advanced payment |
| X15.2 | Correcting a Defect for which the Contractor is not liable |
| Y2.4 | Suspension of performance |
NEC3 ECS - Quick Reference Clause Guide
NEC3 ECS |
|
| Early Warning | |
| Contractor Early Warning | |
| Increase the total of the Prices | |
| Delay Completion | |
| Delay meeting a Key Date | |
| Impair the performance of the works in use | |
| Affect the achievement of another Partner's objectives | |
| Subcontractor Early Warning | |
| Increase the total of the Prices | |
| Delay Completion | |
| Delay meeting a Key Date | |
| Impair the performance of the subcontract works in use | |
| Affect the achievement of another Partner's objectives | |
| Increase the Subcontractor's total cost | |
| Instructions | |
| Contractor Instructions | |
| 14.3 | to change the Subcontract Works Information or a Key Date |
| 17.1 | to resolve an ambiguity or inconsistency |
| 18.1 | to change the Subcontract Works Information to remove something which is illegal or impossible |
| 19.1 | on how to deal with a prevention event |
| 23.1 | to submit particulars of design of an item of Equipment |
| 24.2 | to remove an employee |
| 26.4 | to submit proposed contract data for a subsubcontract (main Options C, D, E and F) |
| 32.2 | to submit a revised programme |
| 34.1 | to stop or not start work |
| 34.1 | to start or restart work |
| 36.1 | to submit a quotation for acceleration |
| 44.2 | to change the Works Information after accepting a proposal not to correct a Defect |
| 62.1 | to submit alternative quotations for a compensation event |
| 73.1 | on how to deal with an object of value of historical interest |
| 82.1 | to not replace or repair the works, Plant and Material following loss or damage |
| 92.2 | to leave Site, remove Equipment, Plant and Materials and assign the benefit of the subcontract to the Employer |
| X12.1(4) | providing Partnering Information |
| Other Instruction | |
| Programme | |
| Contractor Reply - Not Accepted | |
| The subcontractor's plans which it shows are not practicable | |
| It does not show the information which this subcontract requires | |
| It does not represent the subcontractor's plans realistically | |
| It does not comply with the Subcontract Works Information | |
| Notifications | |
| Contractor Notifications | |
| 13.2 | of a change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation events periods) |
| 14.2 | of the cancellation of a delegation |
| 17.1 | of an ambiguity or inconsistency |
| 27.2 | to provide access to the work being done and Plant and Materials being stored |
| 41.1 | that Plant and Materials have passed a test or inspection |
| 44.1 | of a proposal to accept a Defect |
| 45.1 | of the amount to be paid for uncorrected Defects |
| 45.2 | of the cost the Subontractor would incur in correcting a Defect |
| 61.5 | that the Contractor has decided the Subcontractor did not give early warning of a compensation event |
| 61.6 | that an assumption on which a compensation event quotation is based was wrong |
| 90.1 | of a wish to terminate |
| 91.2 | of a default/of the Contractor having not put right a default |
| 91.3 | of a default/of the Contractor having not put right a default |
| 92.2 | that Equipment is no longer required |
| X7.3 | of the amount of reduction in delay damages following take over of part of the works |
| X18.5 | of a matter for which the Subontractor is liable |
| Y1.5 | of sums due to the Subcontractor and the Named Suppliers |
| Y2.3 | of an intention to pay less than the notified sum |
| Other notification | |
| Subcontractor's Notifications | |
| 13.2 | of a change of address for communications |
| 17.1 | of an ambiguity or inconsistency |
| 18.1 | of an illegal or impossible requirement |
| 20.3 | of advice on the practical implications of the design and subcontracting arrangements (main Options C, D, E and F) |
| 61.4 | of a failure by the Contractor to respond to a compensation event notification |
| 62.6 | of a failure by the Contractor to respond to a quotation |
| 64.4 | of a failure by the Contractor to make an assessment of a compensation event |
| 90.1 | of a wish to terminate |
| Y2.3 | of an intention to pay less than the notified sum |
| Other Notification | |
| Submissions | |
| Subcontractor Submissions | |
| 15.1 | a proposal to add an area to the Working Area |
| 20.4 | forecasts of the total Defined Cost for the whole of the works (main Options C, D, E and F) |
| 21.2 | particulars of design |
| 23.1 | particulars of design for an item of Equipment |
| 24.1 | details of a replacement person |
| 26.2 | the name of a proposed subcontractor |
| 26.3 | proposed subcontract documents |
| 26.4 | proposed contract data for each subcontract (main Options C, D E and F) |
| 44.1 | a proposal to accept a Defect |
| 54.2 | a revised activity schedule (main Option A and C) |
| 85.1 | certificates of insurance |
| X4.1 | a parent company guarantee |
| X13.1 | a performance bond |
| X14.2 | an advance payment bond |
| X20.2 | a report of performance |
| X20.3 | proposals for improving performance |
| Y1.3 | a proposal to add a Supplier to the named list |
| Other submission | |
| Submission with quote | |
| 36.1 | a quotation for acceleration |
| 44.2 | a quotation to accept a Defect |
| Other Assessments | |
| Contractor Assessments | |
| 25.2 | of the amount to be paid as the Subcontractor failed to provide services |
| 25.3 | of the amount assessed for a failure to meet a Key Date |
| 40.6 | of an assessment of the amount to be paid for repeating a test or inspection |
| 46.1 | of the cost to the Contractor of having a Defect corrected |
| 46.2 | of the cost the Subcontractor would incur in correcting a Defect |
| 50.9 | of the correct assessment of part of the Defined Cost (Option C, D, E and F) |
| 51.3 | of interest on a corrected payment certificate |
| 53.3 | of the preliminary assessment of the Subcontractor's share (main Option C and D) |
| 53.4 | of the final assessment of the Subcontractor's share (main Option C and D) |
| 54.7 | of a preliminary amount of the Subcontractor's share (Option C) |
| 54.8 | of the final amount of the Subcontractor's share (Option C) |
| 85.1 | of the cost of insurance provided by the Contractor |
| 86.3 | of the cost of insurance provided by the Subcontractor |
| 93.6 | of the Subcontractor's share on termination (Option C and D) |
| X1.3 | of the price adjustment added to the amount due (Options A and B) |
| X1.4 | of the price adjustment added to the Prices (Option C and D) |
| X6.1 | of the amount of bonus |
| X7.1 | of the amount of delay damages |
| X14.1 | of the amount of advanced payment |
| X14.3 | of the amount of repayment of advanced payment |
| X16 | of the amount to withhold as retention |
| X17 | of the amount of low performance damages |
| X20.4 | of the amount payable for meeting a target on the incentive schedule |
| X22.7(2) | of the preliminary amount of the budget incentive |
| X22.7(3) | of the final amount of the budget incentive |
| Certificates | |
| Contractor Certificates | |
| 30.2 | of certification of the date of Completion |
| 35.3 | of certification of the date of take over of part of the works |
| 90.1 | of the issue of a termination certificate |
| Forecasts | |
| Cost Forecasts | |
| NEC3 ECS Option C - as per Clause 20.4 | |
| NEC3 ECS Option E - as per Clause 20.4 | |
| Compensation Events | |
| 60.1(1) | An instruction to change the Subcontract Works Information |
| 60.1(2) | Contractor does not provide access to the Site |
| 60.1(3) | Contractor does not provide something that he is to provide |
| 60.1(4) | An instruction to stop or not start work or to change a Key Date |
| 60.1(5) | Employer, Contractor or Others do not work within the stated constraints |
| 60.1(6) | Contractor does not reply to a communication |
| 60.1(7) | An instruction dealing with an object of interest or value |
| 60.1(8) | Change of a decision |
| 60.1(9) | Withholds an acceptance |
| 60.1(10) | An instruction to search for a Defect and no Defect is found |
| 60.1(11) | A test or inspection causes unnecessary delay |
| 60.1(12) | Subcontractor encounters physical conditions |
| 60.1(13) | A weather measurement is recorded |
| 60.1(14) | An event which is the Employer's or Contractor's risk |
| 60.1(15) | Contractor certifies Take Over before Completion |
| 60.1(16) | Contractor does not provide material for testing |
| 60.1(17) | Notification of a correction |
| 60.1(18) | A breach by the Contractor |
| 60.1(19) | A prevention event |
| 60.4 | A difference between the final total quantity of an item and the quantity in the Bill of Quantities which delays completion (main Options B and D) |
| 60.5 | A difference between the final total quantity of an item and the quantity in the Bill of Quantities (main Options B and D) |
| 60.6 | Correction of a mistake in the Bill of Quantities caused by a departure in the method of measurement |
| X2.1 | A change in the law |
| X12.3(7) | A change in the Partnering Information |
| X14.2 | Delay in making advanced payment |
| X15.2 | Correcting a Defect for which the Contractor is not liable |
| Y2.4 | Suspension of performance |
NEC3 PSC - Quick Reference Clause Guide
NEC3 PSC |
|
| Early Warning | |
| Employer Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Change the Accepted Programme | |
| Delay meeting a Key Date | |
| Impair the usefulness of the services to the Employer | |
| Affect the work of the Employer, an Employer's contractor or another consultant | |
| Affect the achievement of another Partner's objectives | |
| Consultant Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Change the Accepted Programme | |
| Delay meeting a Key Date | |
| Impair the usefulness of the services to the Employer | |
| Affect the work of the Employer, an Employer's Contractor or another Consultant | |
| Affect the achievement of another Partner's objectives | |
| Increase the Consultant's total cost | |
| Employer Instructions | |
| 11.2(24) | to carry out a Task (main Option G) |
| 16.1 | to resolve an ambiguity or inconsistency |
| 17.1 | to change the Scope to remove something which is illegal or impossible |
| 18.1 | on how to deal with a prevention event |
| 20.2 | to change the Scope or a Key Date |
| 22.2 | to remove a person |
| 24.4 | to submit proposed contract data for a subcontract (main Options C and E) |
| 32.2 | to submit a revised programme |
| 33.1 | to stop or not start work |
| 33.1 | to start or restart work |
| 34.1 | to submit a quotation for acceleration |
| 40.3 | to correct a failure to comply with the quality plan |
| 62.1 | to submit alternative quotations for a compensation event |
| Other Instruction | |
| Programme | |
| Employer Reply - Not Accepted | |
| The Consultant's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Consultant's plans realistically | |
| It does not comply with the Scope | |
| Notifications | |
| Employer Notifications | |
| 13.2 | of a change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation events periods) |
| 16.1 | of an ambiguity or inconsistency |
| 20.1 | of provision of information required by the contract |
| 41.2 | of the amount to be paid for uncorrected Defects |
| 61.5 | that the Employer has decided the Contractor did not give early warning of a compensation event |
| 81.2 | of the insurance certificates for insurances taken out by the Employer |
| 90.1 | of having done one of the things at clause 90.1 |
| 90.3 | that the Employer no longer wants the services or the Consultant has substantially failed to comply with this contract |
| 90.4 | of termination due to a prevention event |
| X10 | of the name of a replacement Employer's Agent |
| X11 | of termination |
| X18.3 | of a matter for which the Consultant is liable |
| Y2.3 | of an intention to pay less than the notified sum |
| Other notification | |
| Consultant Notifications | |
| 13.2 | of a change of address for communications |
| 16.1 | of an ambiguity or inconsistency |
| 17.1 | of an illegal or impossible requirement |
| 23.2 | of a meeting with Others |
| 41.1 | of Defects that have not been corrected at Completion |
| 61.4 | of a failure by the Employer to respond to a compensation event notification |
| 62.6 | of a failure by the Employer to respond to a quotation |
| 64.4 | of a failure by the Employer to make an assessment of a compensation event |
| 90.1 | of having done one of the things at clause 90.1 |
| 90.2 | of termination |
| Other notification | |
| Submissions | |
| Consultant Submissions | |
| 21.3 | forecasts of total expenses for the whole of the services (main Option A) |
| 21.4 | forecasts of total Time Charge and expenses for the whole of the services (main Option C, E and G) |
| 22.1 | details of a replacement person |
| 24.2 | the name of a proposed Subconsultant |
| 24.3 | proposed subcontract documents |
| 24.4 | proposed contract data for each subcontract (main Options C and E) |
| 40.2 | a proposed quality policy statement or quality policy plan |
| 51.3 | further information to justify an invoice |
| 53.2 | a revised activity schedule (main Option A and C) |
| 71.1 | a request for permission to publicise the services |
| 81.2 | certificates of insurance |
| 91.2 | information resulting from work carried out to date |
| X4.1 | a parent company guarantee |
| X9.1 | documents which transfer rights to the Employer |
| X13.1 | a performance bond |
| X20.2 | a report of performance |
| X20.3 | proposals for improving performance |
| Other submission | |
| Submission with quote | |
| 34.1 | a quotation for acceleration |
| Forecasts | |
| Cost Forecasts | |
| NEC3 PSC Option A - as per Clause 21.3 | |
| NEC3 PSC Option C - as per Clause 21.4 | |
| NEC3 PSC Option E - as per Clause 21.4 | |
| Other Assessments | |
| Employer Assessments | |
| 23.3 | of the amount for a failure to meet a Key Date |
| 51.3 | of interest on a corrected payment certificate |
| 54.3 | of a preliminary amount of the Consultant's share (Option C) |
| 54.4 | of the final amount of the Consultant's share (Option C) |
| 85.1 | of the cost of insurance provided by the Employer |
| 92.3 | of the Consultant's share on termination (Option C and D) |
| X1.3 | of the price adjustment added to the amount due (Options A and B) |
| X1.4 | of the price adjustment added to the Prices (Options C and D) |
| X6.1 | of the amount of bonus |
| X7.1 | of the amount of delay damages |
| X20.4 | of the amount payable for meeting a target on the incentive schedule |
| Certificates | |
| Employer Certificates | |
| 30.2 | Completion Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Scope |
| 60.1(2) | Employer does not provide access to a person, place or thing |
| 60.1(3) | Employer does not provide something that he is to provide |
| 60.1(4) | An instruction to stop or not start work or to change a Key Date |
| 60.1(5) | Employer or Others do not work within the stated constraints |
| 60.1(6) | Employer does not reply to a communication |
| 60.1(7) | Change of a decision |
| 60.1(8) | Withholds an acceptance |
| 60.1(9) | Notification of a correction |
| 60.1(10) | A breach by the Employer |
| 60.1(11) | A prevention event |
| 60.1(12) | Correcting a Defect for which the Consultant is not liable |
| 60.1(13) | An instruction to change a Task Order (main Option G) |
| 60.1(14) | Consultant receives the Task Order after the starting date for the Task Order (main Option G) |
| 60.1(15) | A Task Completion is later than the Completion Date (main Option G) |
| 60.2 | A correction of a mistake in the Task Schedule |
| X2.1 | A change in the law |
| X12.3(7) | A change in the Partnering Information |
| Y2.4 | Suspension of performance |
NEC3 TSC - Quick Reference Clause Guide
NEC3 TSC |
|
| Early Warning | |
| Service Manager Early Warnings | |
| Increase the total of the Prices | |
| Interfere with the timing of the service | |
| Impair the effectiveness of the service | |
| Affect the achievement of another Partner's objectives | |
| Contractor Early Warnings | |
| Increase the total of the Prices | |
| Interfere with the timing of the service | |
| Impair the effectiveness of the service | |
| Increase the Contractor's total cost | |
| Affect the achievement of another Partner's objectives | |
| Service Manager Instructions | |
| 14.3 | to change the Service Information |
| 17.1 | to resolve an ambiguity or inconsistency |
| 18.1 | to change the Service Information to remove something which is illegal or impossible |
| 22.1 | to submit a revised programme |
| 23.1 | to submit particulars of the design of an item of Equipment |
| 24.2 | to remove an employee |
| 26.4 | to submit proposed contract data for a Subcontractor (main Options C and E) |
| 32.2 | to stop or not start work |
| 32.2 | to start or restart work |
| 43.1 | to change the Service Information after accepting a proposal not to correct a Defect |
| 86.1 | to submit insurance policies |
| 92.2 | to remove Equipment, Plant and Materials and assign the benefit of the subcontract |
| Other Instruction | |
| Programme | |
| Service Manager Reply - Not Accepted | |
| The Consultant's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Consultant's plans realistically | |
| It does not comply with the Scope | |
| Notifications | |
| Service Manager Notifications | |
| 13.2 | of a change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation events periods) |
| 17.1 | of an ambiguity or inconsistency |
| 18.1 | of an illegal or impossible requirement |
| 25.2 | to provide access to the work being done and Plant and Materials being stored to those named |
| 27.2 | to provide access to the work being done and Plant and Materials being stored |
| 41.1 | that Plant and Materials have passed tests before delivery |
| 41.6 | of an assessment of the amount to be paid for repeating a test or inspection |
| 90.1 | of a wish to terminate the Contractor's obligation to Provide the Works |
| 90.1 | of the issue of a termination certificate |
| 91.2 | of a default |
| 91.3 | of a default |
| X18.5 | of a matter for which the Contractor is liable |
| Y2.3 | to pay less than the notified sum |
| Other notification | |
| Contractor Notifications | |
| 13.2 | of a change of address for communications |
| 17.1 | of an ambiguity or inconsistency |
| 61.4 | of a failure by the Service Manager to reply to a compensation event notice |
| 62.6 | of a failure by the Service Manager to reply to a quotation |
| 90.1 | of a wish to terminate |
| Y2.3 | to pay less than the notified sum |
| Other notification | |
| Submissions | |
| Service Manager Submissions | |
| 86.1 | of the insurance certificates for insurances taken out by the Client |
| Contractor Submissions | |
| 20.4 | of forecasts of the total Defined Costs (main Options C and E) |
| 20.5 | of forecasts of the final total of the Prices (main Option A) |
| 23.1 | of particulars of design of Equipment |
| 24.1 | of the name, qualifications and experience of a proposed replacement person |
| 26.2 | of the name of each proposed Subcontractor |
| 26.3 | of the conditions of contract for each subcontract |
| 26.4 | of proposed contract data for each subcontract (main Options C and E) |
| 43.1 | of a proposal to accept a Defect |
| 54.2 | of a revised Price List (main Options A and C) |
| 85.1 | of certificates of insurance |
| X4.1 | of the provision of a parent company guarantee |
| X13.2 | of a performance bon |
| X20.2 | of a report of performance |
| X20.3 | of proposals for improving performance |
| Y1.4 | of banking arrangements for the Project Bank Account |
| Y1.6 | of a proposal to add a Supplier to the Named Suppliers |
| Y1.9 | of a signed Authorisation |
| Other submission | |
| Submission with quote | |
| 43.1 | a quotation to accept a Defect |
| Forecasts | |
| Cost Forecasts | |
| NEC3 TSC Option C - as per Clause 20.4 | |
| NEC3 TSC Option E - as per Clause 20.4 | |
| Certificates | |
| Supply Manager Certificates | |
| 90.1 | Termination Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Service Information |
| 60.1(2) | Employer does not provide right of access |
| 60.1(3) | Employer does not provide something which he is to provide |
| 60.1(4) | An instruction to stop or not start work |
| 60.1(5) | Employer or Others do not work within the Accepted Plan or Service Information |
| 60.1(6) | Service Manager does not reply to a communication |
| 60.1(7) | Service Manager changes a decision |
| 60.1(8) | Service Manager withholds an acceptance |
| 60.1(9) | Change to the Affected Property |
| 60.1(10) | Employer does not provide things for tests and inspections |
| 60.1(11) | An event which is the Employer's risk |
| 60.1(12) | Service Manager corrects an assumption |
| 60.1(13) | A breach of contract by the Employer |
| 60.1(14) | A breach by the Client |
| X19.10(1) | An instruction to change a Task Order |
| X19.10(2) | Contractor receives a Task Order after the starting date stated in the Task Order |
| X19.10(3) | Employer does not provide right of access |
| X19.10(4) | Employer does not provide something which he is to provide |
| X19.10(5) | Employer of Others do not with within the Accepted Task Order Programme or Service Information |
| X19.10(6) | A prevention event occurs |
| X19.10(7) | Task Completion Date is later than the end of the service period |
NEC3 ECSS - Quick Reference Clause Guide
NEC3 ECSS |
|
| Early Warning | |
| Contractor Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Impair the performance of the subcontract works in use | |
| Subcontractor Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Impair the performance of the subcontract works in use | |
| Increase the Subcontractor's total cost | |
| Affect the achievement of another Partner's objectives | |
| Contractor Instructions | |
| 14.2 | to change the subcontract Works Information |
| 21.3 | to remove an employee |
| 30.4 | to stop or not start work |
| 30.4 | to start or restart work |
| 43.1 | to not replace or repair damage to the works, Plant and Materials |
| 62.2 | that the Subcontractor did not give early warning |
| 70.1 | on how to deal with an object of value or historical interest |
| Other Instruction | |
| Programme | |
| Contractor Reply - Not Accepted | |
| The Consultant's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Consultant's plans realistically | |
| It does not comply with the Scope | |
| Notifications | |
| Contractor Notifications | |
| 13.1 | of a change of address for communications |
| 22.1 | of access required for others |
| 42.2 | of the cost of correcting an uncorrected Defect |
| 61.1 | than an assumption on which a compensation event quotation is based was wrong |
| 62.2 | that the Subcontractor did not give early warning |
| 90.1 | of a wish to terminate the Subcontractor’s obligation to Provide the Works |
| 90.3 | of a default by the Subcontractor |
| Other notification | |
| Subcontractor Notifications | |
| 13.2 | of a change of address for communications |
| 90.1 | of a wish to terminate the Subcontractor’s obligation to Provide the Works |
| Other notification | |
| Submissions | |
| Subcontractor Submissions | |
| 20.1 | of particulars of a design |
| 30.2 | of a forecast of the date of Completion |
| Certificates | |
| Contractor Certificates | |
| 30.2 | Completion Certificate |
| 90.1 | Termination Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Subcontract Works Information |
| 60.1(2) | Contractor does not allow access to the Site |
| 60.1(3) | Contractor does not provide something which he is to provide |
| 60.1(4) | An instruction to stop or not to start work |
| 60.1(5) | Contractor does not work within the required constraints |
| 60.1(6) | Contractor does not reply to a communication |
| 60.1(7) | A change of decision |
| 60.1(8) | An instruction to search for a Defect and no Defect is found |
| 60.1(9) | Physical conditions encountered |
| 60.1(10) | Weather conditions encountered |
| 60.1(11) | A notification of a correction to an assumption stated about a compensation event |
| 60.1(12) | A prevention event occurs |
| 60.1(13) | A difference in quantities |
| 60.1(14) | Loss or damage to the subcontract works |
| 60.1(15) | A change in the completion date of the main contract which effects the Defects Date |
| The Act - 1.4 | Suspension of performance |
NEC3 ECSC - Quick Reference Clause Guide
NEC3 ECSC |
|
| Early Warning | |
| Employer Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Impair the performance of the works in use | |
| Contractor Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Impair the performance of the subcontract works in use | |
| Increase the Contractor's total cost | |
| Employer Instructions | |
| 14.2 | to change the Works Information |
| 21.3 | to remove an employee |
| 30.4 | to stop not start |
| 30.4 | to start or restart work |
| 43.1 | to not replace or repair damage to the works, Plant and Materials |
| 62.2 | to submit alternative quotations |
| 70.1 | on how to deal with an object of value or historical interest |
| Other Instruction | |
| Programme | |
| Employer Reply - Not Accepted | |
| The Consultant's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Consultant's plans realistically | |
| It does not comply with the Scope | |
| Notifications | |
| Employer Notifications | |
| 13.1 | of a change of address for communications |
| 22.1 | of access required for others |
| 42.2 | of the cost of correcting an uncorrected Defect |
| 61.1 | than an assumption on which a compensation event quotation is based was wrong |
| 62.2 | that the Contractor did not give early warning |
| 90.1 | of a wish to terminate the Contractor’s obligation to Provide the Works |
| 90.3 | of a default by the Contractor |
| Other notification | |
| Contractor Notifications | |
| 13.1 | of a change of address for communications |
| 90.1 | of a wish to terminate the Contractor's obligation to Provide the Works |
| Other notification | |
| Submissions | |
| Contractor Submissions | |
| 20.1 | of particulars of a design |
| 30.2 | of a forecast of the date of Completion |
| Certificates | |
| Employer Certificates | |
| 30.2 | Completion Certificate |
| 90.1 | Termination Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Works Information |
| 60.1(2) | Employer does not allow access to the Site |
| 60.1(3) | Employer does not provide something which he is to provide |
| 60.1(4) | An instruction to stop or not to start work |
| 60.1(5) | Employer does not work within the required constraints |
| 60.1(6) | Employer does not reply to a communication |
| 60.1(7) | A change of decision |
| 60.1(8) | An instruction to search for a Defect and no Defect is found |
| 60.1(9) | Physical conditions encountered |
| 60.1(10) | Weather conditions encountered |
| 60.1(11) | A notification of a correction to an assumption stated about a compensation event |
| 60.1(12) | A prevention event occurs |
| 60.1(13) | A difference in quantities |
| 60.1(14) | Loss or damage to the subcontract works |
| The Act - 1.4 | Suspension of performance |
NEC3 PSSC - Quick Reference Clause Guide
NEC3 PSSC |
|
| Early Warning | |
| Client Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Impair the usefulness of the services to the Client | |
| Affect the work of the Client or others with whom the client is in contract | |
| Consultant Early Warnings | |
| Increase the total of the Prices | |
| Delay Completion | |
| Impair the usefulness of the services to the Client | |
| Affect the work of the Client or others with whom the client is in contract | |
| Increase the Consultant's total cost | |
| Client Instructions | |
| 20.2 | to change the Scope |
| 22.3 | to stop using a person to Provide the Services |
| 30.3 | to stop or not start work |
| 30.3 | to restart or start work |
| Programme | |
| Client Reply - Not Accepted | |
| The Consultant's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Consultant's plans realistically | |
| It does not comply with the Scope | |
| Notifications | |
| Client Notifications | |
| 13.1 | change of address |
| 13.2 | people who are to act on the Client’s behalf |
| 42.2 | of the cost of correcting a Defect |
| 71.1 | of permission to publicise the services |
| 81.2 | of copies of insurance certificates |
| 90.1 | to terminate the Consultant’s obligation to Provide the Service |
| 90.2 | of default |
| 90.2 | of termination |
| Consultant Notifications | |
| 13.1 | change of address |
| 13.2 | people who are to act on the Consultant's behalf |
| 41.2 | Defects which have not been corrected at Completion |
| 90.1 | to terminate the Consultant's obligation to Provide the Service |
| Submissions | |
| Consultant Submissions | |
| 22.2 | a replacement key person |
| 50.4 | of further information to justify an invoice |
| 81.2 | of copies of insurance certificates |
| Certificates | |
| Client Certificates | |
| 30.2 | Completion Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Scope |
| 60.1(2) | Client does not take an action within the time required by the contract |
| 60.1(3) | An instruction to stop or not start any work |
| 60.1(4) | Client changes a decision |
| 60.1(5) | A breach of contract by the Client |
NEC3 SSC - Quick Reference Clause Guide
NEC3 SSC |
|
| Early Warning | |
| Purchaser Early Warnings | |
| Increase the total of the Prices | |
| Interfere with the timing of the supply | |
| Impair the performance of the goods in use | |
| Supplier Early Warnings | |
| Increase the total of the Prices | |
| Interfere with the timing of the supply | |
| Impair the performance of the goods in use | |
| Increase the Supplier's total cost | |
| Purchaser Instructions | |
| 14.1 | to change the Goods Information |
| 14.2 | to change the Delivery Date |
| 31.1 | to stop or not start work |
| 31.1 | to start or restart work |
| 43.2 | to change the Goods Information, the Prices and the Delivery Date in respect of an Accepted Defect |
| 82.1 | to not replace lost goos or not repair damaged goods |
| Other Instruction | |
| Programme | |
| Purchaser Reply - Not Accepted | |
| The Consultant's plans which it shows are not practicable | |
| It does not show the information which this contract requires | |
| It does not represent the Consultant's plans realistically | |
| It does not comply with the Scope | |
| Notifications | |
| Purchaser Notifications | |
| 13.1 | of a change of address for communications |
| 23.1 | of an agreement to extend or reduce the batch order interval |
| 90.1 | of a wish to terminate |
| 85.1 | of a request for insurance certificates |
| 85.1 | of insurance certificates |
| 90.3 | of Supplier default |
| Other notification | |
| Supplier Notifications | |
| 13.1 | of a change of address for communications |
| 85.1 | of a request for insurance certificates |
| 85.1 | of insurance certificates |
| 90.1 | of a wish to terminate |
| Other notification | |
| Submissions | |
| Purchaser Submissions | |
| 43.1 | a proposal to accept a Defect |
| Other submission | |
| Supplier Submissions | |
| 43.1 | a proposal to accept a Defect |
| 85.1 | of insurance certificates |
| Other submission | |
| Supplier Quotations for accepting a defect | |
| Supplier Submissions with Quote | |
| 43.2 | a quotation to accept a Defect |
| Certificates | |
| Purchaser Certificates | |
| 90.1 | Termination Certificate |
| Compensation Events | |
| (1) | The Purchaser gives an instruction changing the Goods Information unless the change is in order to make a Defect acceptable |
| (2) | The Purchaser gives an instruction changing the Delivery Date |
| (3) | The Purchaser does not allow access to and use of the premises as necessary for the work included in this contract |
| (4) | The Purchaser does not provide services and other things which he is to provide as stated in this contract |
| (5) | The Purchaser gives an instruction to stop or not to start any work |
| (6) | The Purchaser does not reply to a communication from the Supplier within the period required by this contract |
| (7) | The Purchaser changes a decision which he has previously communicated to the Supplier |
| (8) | An event which is a Purchaser's risk stated in this contract |
| 23.1 | An item of goods required by the Batch Order is not included in the Price Schedule |
| 23.1 | The total quantity of goods in the Bath Orders issued under this contract is different from that stated in the Price Schedule |
| 23.1 | The quantity of goods stated in a Batch Order is not within the range stated in the Contract Data |
NEC3 SC - Quick Reference Clause Guide
NEC3 SC |
|
|
Early Warning |
|
|
Supply Manager Early Warning |
|
| Increase the total of the Prices | |
| Delay Delivery | |
| Impair the performance of the goods in use | |
| Impair the usefulness of the services to the Purchaser | |
| Affect the achievement of another Partner's objectives | |
|
Supplier Early Warning |
|
| Increase the total of the Prices | |
| Delay Delivery | |
| Impair the performance of the goods in use | |
| Impair the usefulness of the services to the Purchaser | |
| Affect the achievement of another Partner's objectives | |
| Increase the Supplier's total cost | |
|
Instructions |
|
|
Supply Manager Instructions |
|
| 14.3 | to change the Goods Information |
| 17.1 | to resolve an ambiguity or inconsistency |
| 18.1 | to change the Goods Information to remove something which is illegal or impossible |
| 19.1 | on how to deal with a prevention event |
| 32.2 | to submit a revised programme |
| 34.1 | to stop or not start work |
| 34.1 | to start or restart work |
| 35.1 | to submit a quotation for acceleration |
| 44.2 | to change the Goods Information, Prices and Delivery Date to accept a defect |
| 62.1 | to submit alternative quotations for a compensation event |
| 82.1 | to not replace or repair damage to the goods |
| 85.1 | to submit insurance policy information for acceptance |
| 92.2 | to leave the Purchaser's premises and remove equipment |
| X12.1(4) | providing Partnering Information |
| Other instruction | |
|
Programme |
|
|
Supply Manager Reply - Not Accepted |
|
|
The Contractor's plans which it shows are not practicable |
|
|
It does not show the information which the contract requires |
|
|
It does not represent the Contractor's plans realistically |
|
|
It does not comply with the Scope |
|
|
Notifications |
|
|
Supply Manager Notifications |
|
| 13.2 | change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation events periods) |
| 14.2 | of the cancellation of a delegation |
| 17.1 | of an ambiguity or inconsistency |
| 25.2 | of a requirement to allow access to others |
| 44.1 | of a proposal that a Defect is accepted |
| 45.1 | of the amount to be paid for uncorrected Defects |
| 45.2 | of the cost the Supplier would incur in correcting a Defect |
| 61.5 | that the Supply Manager has decided the Supplier did not give early warning of a compensation event |
| 61.6 | that an assumption on which a compensation event quotation is based was wrong |
| 88.5 | of a matter which is the Supplier’s liability |
| 90.1 | of a wish to terminate |
| 91.2 | of a default/of the Supplier having not put right a default |
| 91.3 | of a default/of the Supplier having not put right a default |
| 92.2 | of equipment no longer needed |
| X7.3 | of the amount of reduction in delay damages following use of part of the goods |
| Other notification | |
|
Supplier Notifications |
|
| 13.2 | change of address for communications |
| 17.1 | of an ambiguity or inconsistency |
| 18.1 | of an illegal or impossible requirement |
| 61.4 | of a failure to respond to a compensation event notification |
| 62.6 | of a failure to reply to a quotation |
| 64.4 | of a failure to assess a compensation event |
| Other notification | |
|
Submissions |
|
| Supply Manager Submissions | |
| 87.1 | of policies and certificates for insurances provided by the Purchaser |
|
Supplier Submissions |
|
| 21.2 | particulars of design |
| 21.3 | parts of particulars of design |
| 24.2 | the name of a proposed subcontractor |
| 44.1 | of a proposal to accept a Defect |
| 85.1 | insurance policies |
| X4.1 | a parent company guarantee |
| X13.1 | a performance bond |
| X14.2 | an advance payment bond |
| X20.2 | a report of performance |
| X20.3 | proposals for improving performance |
| Other submission | |
|
Submission with quote |
|
| 35.2 | for acceleration to achieve Delivery before the Delivery Date |
| 44.2 | a quotation for accepting a Defect |
| Other Assessments | |
| Supply Manager Assessments | |
| 23.2 | of an assessment of the amount to be paid as the Supplier failed to provide something |
| 40.6 | of the cost incurred by the Purchaser in repeating a test or inspection |
| 45.1 | of the cost to the Purchaser of having a Defect corrected |
| 45.2 | of the cost the Supplier would incur in correcting a Defect |
| 51.3 | of interest on a corrected payment certificate |
| 85.1 | of the cost of insurance provided by the Purchaser |
| X1.3 | of the price adjustment added to the amount due |
| X1.4 | of the price adjustment added to the Prices (Option C and D) |
| X7.1 | of the amount of delay damages |
| X14.1 | of the amount of advanced payment |
| X14.3 | of the amount of repayment of advanced payment |
| X17 | of the amount of low performance damages |
| X20.4 | of the amount payable for meeting a target on the incentive schedule |
| Certificates | |
| Supply Manager Certificates | |
| 90.1 | Termination Certificate |
|
Compensation Events |
|
| 60.1(1) | The Supply Manager gives an instruction to change the Goods Information |
| 60.1(2) | The Purchaser does not allow access to the premises |
| 60.1(3) | The Purchaser does not provide something that he is required to provide |
| 60.1(4) | The Supply Manager gives an instruction to stop or not start work |
| 60.1(5) | The Purchaser or others do not work within the stated conditions |
| 60.1(6) | The Supply Manager does not reply to a quotation |
| 60.1(7) | The Supply Manager changes a decision |
| 60.1(8) | The Supply Manager withholds an acceptance |
| 60.1(9) | The Supply Manager instructs a search for a Defect and no Defect is found |
| 60.1(10) | A test or inspection by the Supply Manager causes unnecessary delay |
| 60.1(11) | Purchaser does not provide records and other information or facilities for tests and inspections |
| 60.1(12) | An event which is the Purchaser's risk |
| 60.1(13) | The Supply Manager notifies correction of an assumption |
| 60.1(14) | A breach by the Purchaser |
| 60.1(15) | A prevention event |
| X2.1 | A change in law |
| X12.3 | A change in the Partnering Information |
| X14.2 | Delay in making an advanced payment |
NEC3 FC - Quick Reference Clause Guide
NEC3 FC |
|
|
Instructions |
|
|
Service Manager Instructions |
|
| 14.3 | to change the Service Information |
| 17.1 | to resolve an ambiguity or inconsistency |
| 18.1 | to change the Service Information to remove something which is illegal or impossible |
| 22.1 | to submit a revised programme |
| 23.1 | to submit particulars of the design of an item of Equipment |
| 24.2 | to remove an employee |
| 26.4 | to submit proposed contract data for a Subcontractor (main Options C and E) |
| 32.2 | to stop or not start work |
| 32.2 | to restart or start work |
| 43.1 | to change the Service Information after accepting a proposal not to correct a Defect |
| 86.1 | to submit insurance policies |
| 92.2 | to remove Equipment, Plant and Materials and assign the benefit of a subcontract |
| Other instruction | |
|
Notifications |
|
|
Service Manager Notifications |
|
| 13.2 | of change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation event periods) |
| 17.1 | of an ambiguity or inconsistency |
| 18.1 | of an illegal or impossible requirement |
| 25.2 | of costs incurred by the Service Manager as a result of the Contractor not providing facilities and other things |
| 27.2 | to provide access to the work being done and Plant and Materials being stored |
| 41.1 | that Plant and Materials have passed tests before delivery |
| 90.1 | of a wish to terminate the Contractor's obligation to Provide the Works |
| 91.2 | of a default |
| 91.3 | of a default |
| X18.5 | of a matter for which the Contractor is liable |
| Y2.3 | to pay less than the notified sum |
| Other notification | |
|
Contractor Notifications |
|
| 13.2 | of a change of address for communications |
| 17.1 | of an ambiguity or inconsistency |
| 90.1 | of a wish to terminate the Contractor's obligation to Provide the Works |
| Y2.3 | to pay less than the notified sum |
| Other notification | |
|
Submission with quote |
|
| 43.1 | a quote for accepting a Defect |
| Certificates | |
| Supply Manager Certificates | |
| 90.1 | Termination Certificate |
NEC3 TSSC - Quick Reference Clause Guide
NEC3 TSSC |
|
|
Risks |
|
|
Service Manager Risks |
|
| Increase the total of the Prices | |
| Interfere with the timing of the service | |
| Impair the effectiveness of the service | |
| Affect the achievement of another Partner's objectives | |
|
Contractor Risks |
|
| Increase the total of the Prices | |
| Interfere with the timing of the service | |
| Impair the effectiveness of the service | |
| Affect the achievement of another Partner's objectives | |
|
Instructions |
|
|
Service Manager Instructions |
|
| 14.3 | to change the Service Information |
| 17.1 | to resolve an ambiguity or inconsistency |
| 18.1 | to change the Service Information to remove something which is illegal or impossible |
| 22.1 | to submit a revised programme |
| 23.1 | to submit particulars of the design of an item of Equipment |
| 24.2 | to remove an employee |
| 26.4 | to submit proposed contract data for a Subcontractor (main Options C and E) |
| 32.2 | to stop or not start work |
| 32.2 | to start or restart work |
| 43.1 | to change the Service Information after accepting a proposal not to correct a Defect |
| 86.1 | to submit insurance policies |
| 92.2 | to remove Equipment, Plant and Materials and assign the benefit of a subcontract |
| Other instruction | |
|
Notifications |
|
|
Service Manager Notifications |
|
| 13.2 | of change of address for communications |
| 13.5 | of an agreement to extend the period for reply for a communication (excluding compensation event periods) |
| 17.1 | of an ambiguity or inconsistency |
| 18.1 | of an illegal or impossible requirement |
| 25.2 | of costs incurred by the Service Manager as a result of the Contractor not providing facilities and other things |
| 27.2 | to provide access to the work being done and Plant and Materials being stored |
| 41.1 | that Plant and Materials have passed tests before delivery |
| 90.1 | of a wish to terminate the Contractor's obligation to Provide the Works |
| 91.2 | of a default |
| 91.3 | of a default |
| X18.5 | of a matter for which the Contractor is liable |
| Y2.3 | to pay less than the notified sum |
| Other notification | |
| Supply Manager Certificates | |
| 13.2 | of change of address for communications |
| 17.1 | of an ambiguity or inconsistency |
| 90.1 | of a wish to terminate the Contractor’s obligation to Provide the Works |
| Y2.3 | to pay less than the notified sum |
| Other notification | |
| Submissions | |
| Service Manager Submissions | |
| 86.1 | of certificates of insurance provided by the Service Manager |
| Contractor Submissions | |
| 20.4 | of forecasts of the total Defined Costs (main Options C and E) |
| 20.5 | of forecasts of the final total of the Prices (main Option A) |
| 23.1 | of particulars of design of Equipment |
| 24.1 | of the name, qualifications and experience of a proposed replacement person |
| 26.2 | of the name of each proposed Subcontractor |
| 26.3 | of the conditions of contract for each subcontract |
| 26.4 | of proposed contract data for each subcontract (main Options C and E) |
| 43.1 | of a proposal to accept a Defect |
| 54.2 | of a revised Price List (main Options A and C) |
| 85.1 | of certificates of insurance |
| X4.1 | of the provision of a parent company guarantee |
| X13.1 | of a performance bond |
| X20.2 | of a report of performance |
| X20.3 | of proposals for improving performance |
| Y1.4 | of banking arrangements for the Project Bank Account |
| Y1.6 | of a proposal to add a Supplier to the Named Suppliers |
| Y1.9 | of a signed Authorisation |
| Other submission | |
| Submission with quote | |
| 43.1 | a quotation to accept a Defect |
| Certificates | |
| Service Manager Certificates | |
| 90.1 | Termination Certificate |
| Compensation Events | |
| 60.1(1) | An instruction to change the Service Information |
| 60.1(2) | The Client does not provide right of access |
| 60.1(3) | The Client does not provide something which he is to provide |
| 60.1(4) | An instruction to stop or not start work |
| 60.1(5) | The Client or Others do not work within the Accepted Plan or Service Information |
| 60.1(6) | The Client does not reply to a communication |
| 60.1(7) | Service Manager changes a decision |
| 60.1(8) | Service Manager withholds an acceptance |
| 60.1(9) | A test or inspection causes unnecessary delay |
| 60.1(10) | A change to the Affected Property |
| 60.1(11) | The Client does not provide things for tests and inspections |
| 60.1(12) | An event which is the Client's risk |
| 60.1(13) | Service Manager corrects an assumption |
| 60.1(14) | A breach of contract by the Client |
| X19.10(1) | An instruction to change a Task Order |
| X19.10(2) | Contractor receives a Task Order after the starting date stated in the Task Order |
| X19.10(3) | Client does not provide right of access |
| X19.10(4) | Client does not provide something which he is to provide |
| X19.10(5) | Client or Others do not work within the Accepted Task Order Programme or Service Information |
| X19.10(6) | A prevention event occurs |
| X19.10(7) | Task Completion Date is later than the end of the service period |